Front Door under construction

We had the front door built and installed waiting for the raised panels (which were in the barn that got hit with the high wind. Ed and AJ brought the panels for the bottom 3 sections into the house & Ed will complete the install sometime this week. I am designing the stained glass for the insert at the top and the side lights. Hopefully this won't take too long, We'll have to see.